GBC Projects

SGI World Cultural Center :

Location:    Santa Monica, CA
Gen. Contractor:    Pozzo Construction
Work performed:   Concrete, Masonry, and Rebar

Along busy Wilshire Boulevard, this project included the installation of a new 13,000 square foot Reinforced Concrete Deck Slab constructed over existing underground parking. The demolition of the existing Four Story structure created some interesting challenges. A 7,500 square foot Plaza, with "serpentine" cast in-place colored concrete walls, and decorative concrete topping was placed over the structural concrete deck.

Click on images to view larger image.
< • Previous Project | Next Project • >
© Copyright 2008. GBC Concrete and Masonry Construction, Inc. All Rights Reserved. Home | About Us | Employment | Contact Us | Projects | Links

License CA #501789 | AZ #121008 | NV #0070437B | OR #0118538