About
This Build
This 3-level outpatient medical facility located at Pomona Valley Hospital included large footings including 5’ deep grade beams on top of continuous footings, requiring the grade beams to be formed with plywood panels. Also, involving installation of slab on grade as well as 58,000 SF of lightweight concrete filled metal decks. This project called for well over 2,000CY of concrete to be installed by GBC.